Navigation


Changes between Version 502 and Version 503 of AstroTechTalk


Ignore:
Timestamp:
10 Feb 2021, 20:32:55 (3 years ago)
Author:
Vianak Naranjo
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • AstroTechTalk

    v502 v503  
    3030|| 29.01.2021 || || ||
    3131|| 05.02.2021 || || ||
    32 || '''12.02.2021 (11hrs, Zoom)''' || '''Michael Lehmitz''' || '''Video-link: [https://zoom.us/j/2521989441 ​https://zoom.us/j/2521989441][[BR]][[BR]]4MOST and the 4MOST Facility Control System (Part 1)'''[[BR]][[BR]]This talk will be a presentation consisting of two parts.[[BR]][[BR]]After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA.  Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained.  Additionally, an overview of the electronic cabinets at the telescope will also be presented.[[BR]][[BR]]Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation.  Besides, the project status and milestones will also be presented.[[BR]][[BR]]Presentation: German[[BR]]Slides: English [[BR]]Questions: German, English ||
    33 || '''19.02.2021 (11hrs, Zoom)''' || '''Michael Lehmitz''' || '''Video-link: [https://zoom.us/j/2521989441 ​https://zoom.us/j/2521989441][[BR]][[BR]]4MOST and the 4MOST Facility Control System (Part 2)'''[[BR]][[BR]]This talk is a presentation consisting of two parts.[[BR]][[BR]]After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA.  Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained.  Additionally, an overview of the electronic cabinets at the telescope will also be presented.[[BR]][[BR]]Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation.  Besides, the project status and milestones will also be presented.[[BR]][[BR]]Presentation: German[[BR]]Slides: English [[BR]]Questions: German, English ||
     32|| '''12.02.2021 (11hrs, Zoom)''' || '''Michael Lehmitz''' || '''Video-link: [https://us02web.zoom.us/j/87350333758?pwd=NlJHdExjUEVETVBPWTRCOXoyRytJUT09][[BR]][[BR]]4MOST and the 4MOST Facility Control System (Part 1)'''[[BR]][[BR]]This talk is a presentation consisting of two parts.[[BR]][[BR]]After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA.  Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained.  Additionally, an overview of the electronic cabinets at the telescope will also be presented.[[BR]][[BR]]Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation.  Besides, the project status and milestones will also be presented.[[BR]][[BR]]Presentation: German[[BR]]Slides: English [[BR]]Questions: German, English ||
     33|| '''19.02.2021 (11hrs, Zoom)''' || '''Michael Lehmitz''' || '''Video-link: [https://us02web.zoom.us/j/81528774196?pwd=TkhXZDBFMEtlK2hpT3duVDVGRFpEQT09][[BR]][[BR]]4MOST and the 4MOST Facility Control System (Part 2)'''[[BR]][[BR]]This talk is a presentation consisting of two parts.[[BR]][[BR]]After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA.  Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained.  Additionally, an overview of the electronic cabinets at the telescope will also be presented.[[BR]][[BR]]Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation.  Besides, the project status and milestones will also be presented.[[BR]][[BR]]Presentation: German[[BR]]Slides: English [[BR]]Questions: German, English ||
    3434|| 26.02.2021 || || ||
    3535|| 05.03.2021 || || ||