Version 503 (modified by 3 years ago) (diff) | ,
---|
The AstroTechTalk (ger) offers a place to discuss, for all interested colleagues and especially for the technical departments, the project leaders, the administration and the scientists as the ultimately users:
- status of instrumentation projects
- scientific tasks and features of the instruments in construction or planned
- new possible involvements
- technical innovations and developments
- technical problems and their solutions
- logistical problems and their solutions
- how to improve operation and observation
- project standards.
Time: Always Fridays 11:00 - 12:00 (during the construction work: 10:00 - 11:00)
Location: MPIA Hoersaal (during the construction work: HdA Auditorium)
Outline:
- Announcements (news, visitors, etc.) (mainly in German)
- Talk of about 30 min about a selected topic (German or English, will be announced)
- Follow up discussion and questions (German or English, depending on the speaker)
Proposals for talks: Please send an email to "hofferbert -at- mpia.de" or "naranjo -at- mpia.de" - alternatively you might reach us by phone (06221-528209 or -290) or in person (room 211 or 018) at MPIA.
Date | Speaker | Topic |
08.01.2021 | -- | Christmas break |
15.01.2021 (11hrs, Zoom) | Silvia Scheithauer | Video-link: https://zoom.us/j/2521989441 Behind the scenes at "help -at- mpia.de" This is NOT a typical AstroTechTalk. It is an initiative by the MPIA Computer Committee. The intended audience is the MPIA technical departments and the administration. As a follow-up to the email by Prof. Rix from December 10, 2020 on the support request for the IT team we will have a presentation on the tasks and non-tasks of the MPIA IT department. It should also raise the awareness for the current working situation of our IT colleagues. The main contents of this presentation had been prepared by the IT department. This presentation will also be given at the PSF coffee and Galaxy coffee to reach a maximum number of MPIA staff. Presentation: German Slides: English Questions: German, English |
22.01.2021 | ||
29.01.2021 | ||
05.02.2021 | ||
12.02.2021 (11hrs, Zoom) | Michael Lehmitz | Video-link: https://us02web.zoom.us/j/87350333758?pwd=NlJHdExjUEVETVBPWTRCOXoyRytJUT09 4MOST and the 4MOST Facility Control System (Part 1) This talk is a presentation consisting of two parts. After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA. Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained. Additionally, an overview of the electronic cabinets at the telescope will also be presented. Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation. Besides, the project status and milestones will also be presented. Presentation: German Slides: English Questions: German, English |
19.02.2021 (11hrs, Zoom) | Michael Lehmitz | Video-link: https://us02web.zoom.us/j/81528774196?pwd=TkhXZDBFMEtlK2hpT3duVDVGRFpEQT09 4MOST and the 4MOST Facility Control System (Part 2) This talk is a presentation consisting of two parts. After a short introduction about 4MOST and its scientific application, part 1 will also introduce us to the 4MOST Consortium and the participation of MPIA. Besides, the 4MOST instrument components (wide field corrector and ADC, A&G camera systems, AESOP – fiber positioner, metrologie camera system, instrument cable wraps, the three spectrographs and corresponding cryo-vacuum control for the detector systems) and its corresponding control electronics will also be explained. Additionally, an overview of the electronic cabinets at the telescope will also be presented. Part 2 focuses on the 4MOST calibration unit and focal station test tool, including the network infrastructure and cabling, the telescope interfaces, and its documentation. Besides, the project status and milestones will also be presented. Presentation: German Slides: English Questions: German, English |
26.02.2021 | ||
05.03.2021 | ||
12.03.2021 | Jan Rybizki | MPIA business trip analysis 2018-2020 |
19.03.2021 | ||
26.03.2021 | ||
02.04.2021 | -- | Good Friday |
09.04.2021 | -- | Easter holidays |
16.04.2021 | ||
23.04.2021 | ||
30.04.2021 | ||
07.05.2021 | ||
14.05.2021 | -- | Bridging days after Ascension |
21.05.2021 | ||
28.05.2021 | -- | Pentecost holidays |
04.06.2021 | -- | Pentecost holidays |
11.06.2021 | ||
18.06.2021 | ||
25.06.2021 | ||
02.07.2021 | ||
09.07.2021 | ||
16.07.2021 | ||
23.07.2021 | ||
30.07.2021 | -- | Summer holidays |
Preview:
DD.MM.2021 - Speaker: Title
TBD 2021: Natalie Fischer and Martin Wetz: Workshop program at the HdA
TBD 2021: Ulf Seemann (ESO): Calibration Work
Postview:
Presentations from 12.09. - 31.12.2014
Presentations from 01.01. - 31.07.2015
Presentations from 01.08. - 31.12.2015
Presentations from 01.01. - 31.07.2016
Presentations from 01.08. - 31.12.2016
Presentations from 01.01. - 31.07.2017
Presentations from 01.08. - 31.12.2017
Presentations from 01.01. - 31.07.2018
Presentations from 01.08. - 31.12.2018
Presentations from 01.01. - 31.07.2019
Presentations from 01.08. - 31.12.2019
Presentations from 01.01. - 31.07.2020
Attachments (11)
- instrum8_gr.jpg (82.6 KB) - added by 10 years ago.
- instrum4_gr.jpg (104.4 KB) - added by 10 years ago.
- pedv3_gr.jpg (213.9 KB) - added by 10 years ago.
- alfa3.5.gif (235.6 KB) - added by 10 years ago.
- CIAO.jpg (3.8 MB) - added by 8 years ago.
- linc_nirvana_labor.jpg (255.2 KB) - added by 8 years ago.
- MATISSE.jpg (43.1 KB) - added by 8 years ago.
- miri_fm_filterwheel.jpg (145.6 KB) - added by 8 years ago.
- PACS-Chopper.jpg (80.0 KB) - added by 8 years ago.
- simple_loop.gif (965.4 KB) - added by 8 years ago.
- teaser.jpg (13.5 KB) - added by 8 years ago.
Download all attachments as: .zip